From I-295 to Atlee Road
The purpose of this study is to evaluate safety and operational issues and develop solutions along U.S. Route 301 (Chamberlayne Road) from I-295 to Atlee Road, including the Route 637 (Atlee Station Road) and Route 1206 (Cudlipp Avenue/Lockwood Boulevard) intersections, and along Atlee Road from U.S. Route 301 (Chamberlayne Road) to Barnfield Lane. This 1.1-mile corridor includes segments identified with VTrans Priority 2 District Needs. The study goals are to identify safety, capacity, transportation demand management, and accessibility (bicycle and transit) improvements along the corridor for all transportation users.
District Lead: Liz McAdory
Lead Consultant: Sachin Katkar
PHASE | DATES | TASKS |
---|---|---|
Phase 1 | May - August 2023 | Diagnose Problems/Conduct Initial Public Outreach/Brainstorm Alternatives |
Phase 2 | September - December 2023 | Evaluate Preliminary Alternatives/Conduct Public Outreach and Obtain Feedback/Select Preferred Alternatives |
Phase 3 | January-July 2024 | Conduct Risk Assessment/Develop and Refine Preferred Alternatives/Prepare Cost Estimate and Investment Strategy |
RI-23-11 Phase 1 Executive Summary - PDF, 5.7MB
The Phase 1 survey regarding potential transportation safety, operations, capacity preservation, access, transportation demand management, and bicycle/transit improvements along U.S. Route 301 (Chamberlayne Rd.) from I-295 to Atlee Rd. and along Atlee Rd. from U.S. Route 301 (Chamberlayne Rd.) to Barnfield Ln. in Hanover County is complete.
Dates | Number of Participants (unique individuals) |
---|---|
August 14-28, 2023 | 295 |
The following needs have been identified for this study. Do you agree with this initial assessment? | |
---|---|
Safety | 86% |
Capacity Preservation | 64% |
Transportation Demand Management | 60% |
Operations | 50% |
Bicycle Accessibility | 32% |
Transit Accessibility | 29% |
What mode(s) of travel do you use when traveling along the study area? | |
---|---|
Personal Vehicle | 99% |
Cycling | 9% |
Walking | 8% |
Truck or Commercial Vehicle | 5% |
Taxi / Uber / Lyft | 3% |
Carpool / Vanpool | 2% |
Other | 2% |
Metro Bus, Local Bus, or Commuter Bus | 0% |
The Phase 2 survey regarding potential improvements along U.S. Route 301 (Chamberlayne Rd.) from I-295 to Atlee Rd. and along Atlee Rd. from U.S. Route 301 (Chamberlayne Rd.) to Barnfield Ln. in Hanover County is complete.
Dates | Number of Participants (unique individuals) |
---|---|
April 29 – May 13, 2024
|
1,318 |
Intersection of Chamberlayne Road (US Route 301) at Cudlipp Avenue / Lockwood Boulevard
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Restriping westbound Lockwood Boulevard lane configuration to one left-turn lane, one thru lane, and one right-turn lane. | 11% | 5% | 32% | 22% | 30% |
Changing signal phasing for the side streets for traffic on eastbound Cudlipp Avenue and westbound Lockwood Boulevard for all movements to operate permissively. | 14% | 7% | 27% | 22% | 31% |
Intersection of Chamberlayne Road (US Route 301) at Leon Lane / Times Dispatch Boulevard
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Restriping westbound Times Dispatch Boulevard lane configuration to one left-turn lane, one through lane, and one right-turn lane. | 15% | 7% | 22% | 22% | 35% |
Changing signal phasing for traffic on eastbound Leon Lane and westbound Times Dispatch Boulevard for all movements to operate permissively. | 15% | 8% | 20% | 23% | 34% |
Changing the control for the eastbound Leon Lane and westbound Times Dispatch Boulevard right-turn movements so the movement will be controlled by the traffic signal. | 13% | 7% | 23% | 21% | 36% |
Installing pedestrian facilities for the west, south, and east legs of the intersection. | 24% | 5% | 12% | 13% | 45% |
Installing sidewalk on both sides of Chamberlayne Road (US Route 301). | 25% | 5% | 11% | 10% | 49% |
Intersection of Chamberlayne Road (US Route 301) at Atlee Station Road
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Restriping eastbound and westbound Atlee Station Road approaches to one left-turn lane, one thru lane, and one right-turn lane. | 17% | 8% | 16% | 19% | 41% |
Changing signal phasing for traffic on eastbound and westbound Atlee Station Road for all movements to operate permissively. | 18% | 8% | 14% | 20% | 40% |
Controlling the eastbound Atlee Station Road right-turn movement with the traffic signal. | 18% | 8% | 14% | 19% | 41% |
Add a third thru-lane and new right-turn lane on southbound Chamberlayne Road. | 13% | 4% | 12% | 21% | 50% |
Installing pedestrian facilities for the west, north, and east legs of the intersection. | 24% | 4% | 10% | 13% | 50% |
Installing sidewalk along west side of Chamberlayne Road including under railroad bridge. | 25% | 3% | 10% | 11% | 52% |
Intersection of Chamberlayne Road (US Route 301) at Atlee Road
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Restriping the westbound Atlee Road approach to one left-turn lane, two through lanes, and one right-turn lane. | 15% | 5% | 12% | 23% | 45% |
Adding a second right-turn lane from northbound Chamberlayne Road (US Route 301) to eastbound Atlee Road. | 18% | 11% | 16% | 17% | 39% |
Extending the northbound Chamberlayne Road (US Route 301) double left-turn lanes by 225 feet. | 10% | 2% | 11% | 21% | 55% |
Adding a third thru lane on southbound Chamberlayne Road (US Route 301) through the intersection – this would extend from Rutlandshire Drive to the existing third southbound lane south of Atlee Station Road. | 12% | 5% | 11% | 22% | 51% |
Installing pedestrian facilities for all approaches of the intersection. | 23% | 3% | 10% | 10% | 54% |
Intersection of Atlee Road at Barnfield Lane
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Constructing a roundabout. | 25% | 6% | 8% | 15% | 46% |
Installing pedestrian facilities for all approaches of the intersection. | 19% | 2% | 11% | 11% | 57% |
Transit and Travel Demand Management (TDM) Improvements
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Constructing a park and ride facility. | 29% | 8% | 22% | 15% | 27% |
Installing sidewalk along the east side of Chamberlayne Road (US Route 301) from Leon Lane/Times Dispatch Boulevard to Rutlandshire Drive and along the west side of Chamberlayne Road (US Route 301) from Times Dispatch Boulevard to Atlee Station Road. | 26% | 4% | 15% | 10% | 44% |
Providing right-in/right-out only access to the proposed park and ride facility along Times-Dispatch Boulevard. | 29% | 7% | 24% | 14% | 27% |
Corridor Wide Pedestrian and Bicycle Access Improvements
1. Strongly oppose | 2. Somewhat oppose | 3. Neutral | 4. Somewhat support | 5. Strongly support | |
---|---|---|---|---|---|
Installing sidewalk along the southbound side of Chamberlayne Road (US Route 301) from Leon Lane/Times Dispatch Boulevard to Rutlandshire Drive and along the northbound side of Chamberlayne Road (US Route 301) from Times Dispatch Boulevard to Atlee Station Road. | 24% | 3% | 12% | 11% | 51% |
Upgrading the existing sidewalk to a shared-use path along the eastbound side of Atlee Road from Chamberlayne Road (US Route 301) to the railroad overpass just east of Atlee Station Road. | 21% | 3% | 12% | 12% | 52% |